Do you have any Questions?
Please read questions bellow and if you can not find your answer, please send us your question, we will answer you as soon as possible.
Frequently Asked Questions
General Questions
roof plan map, facade, section of shelter and cantilever or projecting areas (in Autocad format) and photo and completing the questionnaire form (pdf file)
6 to 10 meter working platforms are the best option for safe and quick implementation of façade construction.
Checking the dimensions of the building (usually for buildings above 10 floors, the use of traditional scaffolding is not recommended in terms of safety)
Checking the type of executive work in the facade (it is safer to use a platform for work that requires carrying tools and equipment) checking the duration of the scaffolding or climber
Usually, for portable systems, the floor area of the platform is multiplied by 150 kg and the allowable capacity of the platform floor is calculated, so simply having a strong lifting motor does not determine the lifting capacity of the system. The length of the platform, the material of the platform and the manufacturer are decisive.
